We have carried out the following investment projects for our Customers:
- Construction of RAWA Commercial Park in Katowice in Aleja RoĽdzieńskiego 93 for Inter IKEA Centre Polska S.A.
- Construction of complete anodizing line and building of sewage treatment plant in the Finished Products Warehouse of Kęty Group S.A. in ul. Ko¶ciuszki 111 for KĘTY GROUP S.A.
- Construction of HYPERNOVA superstore in Zamo¶ć together with shopping gallery, car-park and reconstruction of national road for Ahold Polska Sp. z o.o.;
- Development of Ahold Distribution Centre with accompanying works (connections, car-park, power engineering works) in Bielsko-Biała for Ahold Polska Sp. z o.o.;]
- Building project of MAX/Albert chain stores together with accompanying works (connections, reconstruction of urban roads, car-parks, power engineering works) in Grodzisk Mazowiecki, Kozienice, Wrocław, Bełchatów, Gdańsk, Gdynia and Katowice for Ahold Polska Sp. z o.o.;
- Building project of Max-Ahold store together with accompanying works (connections, building of car-park, power engineering works) in Kra¶nik Lubelski for Saller Polbau Sp. z o.o. in Bolesławiec;
- "Biedronka" stores in Skoczów, Jastrzębie Zdrój (ul. Warmińska, ul. Turystyczna), Rydułtowy, Nysa, D±browa Górnicza, Katowice, Krapkowice, Gliwice, Piława Górna (ul. Sucha, ul. Kiełczowska, ul. Krynicka), Gorzów Wielkopolski, Strzelce Opolskie, Racibórz, Rybnik, Goleniów, Tarnowskie Góry, Będzin, Wodzisław ¦l±ski, Opole, Łazy, Łososina, Lesko;
- "Eurocash" warehouses in Chorzów, Katowice, Kalisz, Tarnobrzeg, Sieradz, Częstochowa, Sosnowiec, Bielsko-Biała, Kielce, Opole, Szczecin and general repairs in Piekary ¦l±skie and in Sosnowiec;
- Stores of the textile and household equipment branch in Bydgoszcz (3 objects), Chorzów, Sosnowiec (2 objects), Wodzisław ¦l. and in many other towns;
- Car-parks and roads for the Steelworks Huta Będzin S.A. and former Huta Buczka S.A., as well as the Town Hall in Swiętchłowice;
- Roads, car-parks, sidewalks, sewage system made of PVC pressure pipes in the steelworks: former Huta Cedler S.A. and in Huta Ferrum S.A;
- Pipeline in preinsulated pipe technology in Huta Ferrum S.A.;
- General renovation of gate-house and meeting hall in former Huta Cedler S.A. steelworks;
- Roads and slag settling tank (complex reinforced concrete structure) and renovation of building with change of facade in Elektrociepłownia Będzin S.A. (Thermal-electric Power Station Będzin Joint Stock);
- Modernization of main washroom (3 floors) in Fabryka Przewodów Energetycznych (Power Cable Factory) in Będzin;
- Demolition of buildings in Huta Ferrum S.A. with a surface of 50,000 m2 and modernization of existing buildings;
- Renovation of four centres and seven buildings for MOPS (Municipal Social Welfare Centre) in Katowice;
- Carrying out additional storeys on two buildings for Zakł±d Budynków Komunalnych (Municipal Buildings Establishment) in CzeladĽ;
- Roads, yards, small architecture buildings in Elektrownia Łagisza S.A (Łagisza Power Plant);
- Modern Poultry Hatchery in ¦więtochłowice for ¦l±skie Zakłady Drobiarskie S.A. (Silesian Poultry Company Joint Stock) in Chorzów and office buildings in Studzienice;
- Modernization of buildings in Będzin, Włocławek and Siemianowice ¦l±skie for former ¦l.Z.P.C. Hanka;
- Laying chemically resistant floors and adaptation of raffinate building for social purposes for Unilever Polska S.A. Katowice Branch;
- Execution of roads and terminals and platform for Hutchinson factory in Żywiec commissioned by Herve Polska Sp. z o.o.
Currently carried out investments:
- Construction of trade-shops for Jeronimo Martins Dystrybucja S.A.
- Construction of production shop for MECALUX Sp. z o.o. in Gliwice
|